At Empresarios Agrupados, our track record in the hydraulic sector is a testament to robust engineering and innovative solutions. We have participated in more than 20 large-scale hydraulic projects, including Hydroelectric Power Plants and complex Pumped Storage projects. We support our clients throughout the entire project life cycle: from the initial Conceptual and Feasibility Phases [...]
-
Location: Bulgaria, 2025 Utility/Customer: EIB/NEK Configuration: A prefeasibility study of four alternatives were performed in order to find the best option to obtain a 1600 MW project. These were the following ones: 1. Projects defined in the TOR (Batak & Dospat: 800 MW each one); 2. Project in the vicinity of Dospat reservoir (1,600 MW); 3. Project [...]
-
Location: Spain, 2022 Utility/Customer: EDF- MERIDIAM Configuration: Due Dilligence / regulatory, geotechnical and electromechanical study in respect of the acquisition of assets of a private company in energy generation industry in Spain including the project of a pumped storage power plant (400 MW) Owner's Engineer: Due Diligence
-
Location: Panama, 2021 Utility/Customer:Naturgy Configuration: Review the electrical engineering performed by a third party, owner's engineering Owner's Engineer: Design Review
-
Location: Spain, 1989 Utility/Customer: IBERDROLA Configuration: - Transient stability:Power generation units Interconnection of HV systems - Units speed regulators and excitation systems Modelling and analysis of parameters - Short-circuits in electrical systems - Insulation coordination Deterministic and probabilistic analyses Insulation optimisation - Short-circuits in electrical systems Scope of services: Elecrical studies
-
Location: Spain, 1994 Utility/Customer: Tecnología Hidráulica/Confederación Hidrográfica del Júcar Configuration: Rock dam with impervious clay core of 109 m height and 428 m length located in the province of Castellón Scope of services: Design project of the spillway
-
Location: Spain, 1994 Utility/Customer: Tecnología Hidráulica/Confederación Hidrográfica del Guadalquivir Configuration: Earth dam with impervious clay core of 89m height and 685m length located in the province of Jaén Scope of services: Study of slope stability and channel levels in floods
-
Location: Spain, 1994 Utility/Customer: Tecnología Hidráulica/Confederación Hidrográfica del Duero Configuration: Earth dam with impervious clay core of 19 m height and 1113 m length located in the province of Salamanca Scope of services: Design project of the canals and dam
-
Location: Spain, 1995 Utility/Customer: Tecnología Hidráulica/Confederación Hidrográfica del Segura Configuration: Concrete arch gravity dam of 30,70 m height and 198 m length located in the province of Albacete Scope of services: Project design of the dam
- Load more...
Category Archives
Category Name: Hydroelectric Projects
Argentina (2) Bulgaria (3) Chile (5) Conventional Generation (9) Czechia (1) Due Diligence (12) Energy transition (8) Energy Transition (7) España (3) France (6) Greece (2) Hungary (2) Italy (3) Mexico (3) Morocco (2) Nuclear (34) Portugal (5) Renewable (6) Saudi Arabia (3) Slovakia (3) Spain (76) Sweden (2) United Arab Emirates (2) United Kingdom (1) United States of America (2)