Pumped Hydro Storage for the National Electricity Company

Projects - Energy transition

  • Location: Bulgaria, 2025
  • Utility/Customer: EIB/NEK
  • Configuration: A prefeasibility study of four alternatives were performed in order to find the best option to obtain a 1600 MW project. These were the following ones:
    1. Projects defined in the TOR (Batak & Dospat: 800 MW each one);
    2. Project in the vicinity of Dospat reservoir (1,600 MW);
    3. Project in the vicinity of Batak reservoir (1,600 MW);
    4. Project in the vicinity of Dospat reservoir (800MW) + project connecting Dospat & Shiroka Poliana (800 MW)
  • Owner’s Engineer:
    • Prefeasibility study