The company will oversee the engineering and construction of the projects planned across mainland Spain and the Balearic Islands.
EAG (Empresarios Agrupados – GHESA) has been awarded the owner’s engineering contract for the twelve synchronous condenser projects commissioned by Red Eléctrica and included in the 2021–2026 Electricity Transmission Network Development Plan. The projects will be built across mainland Spain and the Balearic Islands.
These devices are essential to increasing the resilience of the electricity system and reducing costs for consumers, as well as cutting energy imports and carbon emissions. Furthermore, given their local nature, they will be geographically distributed to strengthen their role in different areas of the system, complementing the equipment and solutions already in place across the electricity grid. Their installation provides dynamic voltage control, helping to reduce the additional costs associated with technical constraints in the day-ahead electricity market arising from voltage control. It also enables the integration of a greater share of renewable generation.
The scope of EAG’s contract covers both the review of the engineering developed by the various EPC contractors and the supervision of construction across all twelve projects.
Read the complete press release here