Project: Front-End-Engineering-Design Las Navas project (2024-current)

Client: Lithium Iberia

EAG has developed the Front-End-Engineering-Design of the Las Navas plant, whose expected average production rate will be 1.2 million tonnes per year of ore and 30,000 tonnes per year of battery grade lithium hydroxide. EAG has been in charge of the optimization of the plant to minimize OPEX, focusing and maximizing the efficiency of the process in all engineering disciplines.