Coal and Fuel-oil

yanbu_area

Planta en Yanbu

In charge of the complete basic and detail design of 29 plants with a sum total of more than 17,000 MW installed.

Key Project: YANBU III, one of the largest thermoelectric power plants in the world, consisting of 5×600 MW supercritical units of heavy fuel-oil and natural gas, producing 550,000 m3/day of steam for a seawater desalination plant for the Saline Water Conversion Corporation (SWCC) in Saudi Arabia.

Business development manager:
  José María Delgado, jmdelgado@empre.es

Gas: Simple and Combined Cycle

In charge of the complete basic and detail design of 45 power plants with a sum total installed power of 28,300 MW, using technology of the main OEM (General Electric, Mitsubishi, Siemens, Ansaldo).

Key Project: Agios Nikolaos IPP, with an output of 860 MW of electric power, for the MYTILINEOS GROUP, and the last projected completed with a class H turbine.

Business development manager:
  José María Delgado, jmdelgado@empre.es

Cogeneration

Industrial cogeneration plants allow the simultaneous generation of electrical and thermal energies, obtaining high efficiencies and reducing industrial costs.

Empresarios Agrupados designs, builds and operates cogeneration plants for a wide range of industrial applications:

  • Pulp and Paper
  • Ceramics and Tiles
  • Textile
  • Petrochemical
  • Other industrial sectors

 

Reliability and cost-effectiveness are the guiding parameters for every project.

Attention to detail is critical to designing a cost-effective cogeneration project. Energy needs must be assessed and the expectations of the industrial partner must be known. Furthermore plant constraints must be identified in order to optimize the industrial process and reduce energy costs.

Business development manager:
  José María Delgado, jmdelgado@empre.es