- December 2024
-
Location: Client: ENDESA Configuration: Scope of Services: Technical and Economic Feasibility Study of a pilot plant (16MW) with pulverized coal and circulating fluidized bed boilers, compression and purification unit, transport center and geological storage (Burgos).
-
Location: Spain Client: ENDESA GENERATION Technology: Oxy-fuel combustion plant with CB boiler and CO2 transport and storage Scope of services: Technical feasibility, technology assessment and design of the 330 MW oxy-fuel power plant project with CFB boiler and CO2 capture transport and storage. Includes H2 generation capacity. Engineering and design development for the complete FEED [...]
-
Location: Ciudad Real, Spain Client: KBE, SBE, Air Liquide Technology: GICC ELCOGAS: CO2 Capture and H2 Production Pilot Plant Scope of services: Complete engineering development, design construction supervision and commissioning of a Pilot Plant for 3600 Nm3/h of Sym Gas coming from the Gasifier of the ELCOGAS Plant. The Plant includes a CO2 and H2 conversion [...]
- Load more...
Category Archives
Category Name: CO2 Capture
Argentina (2) Belgium (1) Bulgaria (2) Chile (5) Conventional Generation (9) Czechia (1) Due Diligence (12) Energy Transition (7) España (3) France (6) Greece (2) Hungary (2) Italy (3) Mexico (3) Morocco (2) Nuclear (32) Portugal (5) Renewable (6) Saudi Arabia (3) Slovakia (3) Spain (60) Sweden (2) Taiwan (1) United Arab Emirates (2) United States of America (2)