We’re very happy and proud to announce that an article by Roque Luis Perezagua, engineer at EAG (Empresarios Agrupados – GHESA), has been recently featured in Nuclear Magazine (Sociedad Nuclear Española) about the Navier-Stokes equations. Considered the first step in comprehending the elusive phenomenon of turbulence. In May 2000, the Clay Mathematics Institute identified this […]
- March 2024
-
-
Location: Europe and America Operator/Client: Several Configuration/Power Output: 1MW-1GW Scope of services: Empresarios Agrupados is a front-running Engineering firm in planning and executing green hydrogen production plants associated with sources of renewable energy. Over the last several years, Empresarios Agrupados has worked on developing the engineering for green H2 production plants. This work has ranged from the initial [...]
-
Location: Atacama (Chile) Operator/Client: ENEL Configuration/Power Output: Hydrogen pipeline.941 km + 226 km Scope of Services: Mechanical evaluation of the pipeline. Definition of the delivery requirements. Calculation of the Lineback base and storage capacity. Evaluation of additional storage.
-
Location: Huesca Operator/Client: Confidential Configuration/Power Output: 35MW Scope of Services: H2 production plant pre-FEED.
-
Location: Spain Operator/Client: Confidential Configuration/Power Output: 200 MW (ELY), 90 KTm/yr Scope of Services: Pre-FEED
-
Location: Villeta, Paraguay Operator/Client: Grupo Urbas Configuration/Power Output: 120MW Scope of Services: Performance of a FEED for a plant with 120 MW installed capacity to produce 250,000 tons of calcium ammonium nitrate per year. H2, ammonia and nitric acid production plant. Renewable hydroelectric energy source.
-
In the DEMO-Oriented NEutron Source (DONES) facility, it is expected to use a considerable amount of lithium at an average temperature higher than 300 ◦C. It is well known that lithium can produce exothermic reactions with several media, generating corrosive and toxic (upon burning) reaction products and with the potential risk of mobilizing radionuclides in […]
-
Empresarios Agrupados, in consortium with Egis and Orano Projets, have been awarded a contract by Norwegian Nuclear Decommissioning (NND) to develop storage solutions for spent nuclear fuel and radioactive waste in Norway, including Deep Borehole Disposal (DBD). The NND, an agency under the Norwegian Ministry of Trade and Industry, is responsible for the decommissioning of […]
-
On January 9th, the Barcelona Football Club selected Limak Construction, which presented a proposal supported by GHESA and Vopi4, for the remodeling of the new Spotify Camp Nou. The architectural design for the tender was done by Nikken Sekkei, b720 and Idom. GHESA, Spanish engineering company with 60 years of experience and projects in more […]
-
El problema de los tres cuerpos consiste en determinar las posiciones y velocidades de tres masas cualesquiera sometidas exclusivamente a la atracción gravitacional mutua y partiendo de unas posiciones y velocidades dadas. Si bien para dos cuerpos existe solución analítica al problema, esto no ocurre cuando el número de cuerpos es mayor o igual que […]
- Load more...