The transition to a sustainable and decarbonized energy system is one of the most pressing challenges of the 21st century. In this context, EAG has strengthened its strategic positioning through: Engineering and consulting with specific experience in renewable hydrogen, ammonia, and e-methanol projects, spanning over 25 years and more than 3,000 megawatts Participation in energy […]
- May 2026
-
-
The COMBATE project, supported by the Centre for Technological Development and Innovation (CDTI) through the 2025 Science and Innovation Missions Programme (File No. MIG-20251019), has as its main objective the research of innovative technological pathways for the production of sustainable synthetic fuels, produced safely, more efficiently, and cost[1]effectively, aimed at the maritime transport sector. Through […]
-
Efficient valorization of CO2 and bio-waste for long-term energy storage using a microwave plasma torch and quenching using the reverse Boudouard Reaction. EAG (Empresarios Agrupados – GHESA) continues in the development of sustainable solutions for long-term energy storage. The EffiTorch Project uses a microwave plasma torch and rapid quenching based on the reverse Boudouard reaction […]
-
At Empresarios Agrupados, our track record in the hydraulic sector is a testament to robust engineering and innovative solutions. We have participated in more than 20 large-scale hydraulic projects, including Hydroelectric Power Plants and complex Pumped Storage projects. We support our clients throughout the entire project life cycle: from the initial Conceptual and Feasibility Phases [...]
-
Location: Bulgaria, 2025 Utility/Customer: EIB/NEK Configuration: A prefeasibility study of four alternatives were performed in order to find the best option to obtain a 1600 MW project. These were the following ones: 1. Projects defined in the TOR (Batak & Dospat: 800 MW each one); 2. Project in the vicinity of Dospat reservoir (1,600 MW); 3. Project [...]
-
Location: Spain, 2022 Utility/Customer: EDF- MERIDIAM Configuration: Due Dilligence / regulatory, geotechnical and electromechanical study in respect of the acquisition of assets of a private company in energy generation industry in Spain including the project of a pumped storage power plant (400 MW) Owner's Engineer: Due Diligence
-
Location: Panama, 2021 Utility/Customer:Naturgy Configuration: Review the electrical engineering performed by a third party, owner's engineering Owner's Engineer: Design Review
-
Location: Spain, 1989 Utility/Customer: IBERDROLA Configuration: - Transient stability:Power generation units Interconnection of HV systems - Units speed regulators and excitation systems Modelling and analysis of parameters - Short-circuits in electrical systems - Insulation coordination Deterministic and probabilistic analyses Insulation optimisation - Short-circuits in electrical systems Scope of services: Elecrical studies
-
Location: Spain, 1994 Utility/Customer: Tecnología Hidráulica/Confederación Hidrográfica del Júcar Configuration: Rock dam with impervious clay core of 109 m height and 428 m length located in the province of Castellón Scope of services: Design project of the spillway
-
Location: Spain, 1994 Utility/Customer: Tecnología Hidráulica/Confederación Hidrográfica del Guadalquivir Configuration: Earth dam with impervious clay core of 89m height and 685m length located in the province of Jaén Scope of services: Study of slope stability and channel levels in floods